Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

南京安奈试验设备有限公司

盐雾(交变)腐蚀试验箱、二氧化硫试验箱、高低温试验箱、高低温(交变)湿热试验...

sell
  • There is no classification
contact
  • Contact:臧勤
  • Phone:025-87186835
  • Email:sales@njanai.com
search
 
link
  • There is no link yet
home > sell > Nanjing rain test chamber manufacturer
Nanjing rain test chamber manufacturer
products: Views:4Nanjing rain test chamber manufacturer 
brand: 安奈仪器
工作室尺寸: 1000×1000×1000
试验台面积: φ400mm
样品架转速: 1~4r/min可调
price: 面议
MOQ: 1 台
Total supply:
Delivery date: Shipped within days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-05-31 14:19
 
Details
Model Specifications
Model Studio Size Volume Pre-installed Power Delivery Time
- working days
Product Description
The damage caused by natural rain to products and materials causes inestimable economic losses every year. The damage caused mainly includes corrosion, fading, deformation, strength reduction, swelling, mold, etc. Electrical products in particular are prone to fires due to short circuits caused by rain. Therefore, conducting shell protection water testing for specific products or materials is an essential and critical procedure.
This set of waterproof testing equipment can be used to assess and determine whether the shells and seals of electrical and electronic products can ensure good working performance of the equipment and components after or during the water test. The equipment can completely simulate the external rain environment and fully reproduce the impact of the external rain environment on the product.
This equipment can provide corresponding environmental simulation and accelerated testing for scientific research, product development and quality control.
Reference standards
Made according to standards - enclosure protection level, and requirements for equipment. The swing tube rain test with ~(theoretical value) swing amplitude can be carried out. The artificial simulated rain test of this equipment does not include rainfall with strong wind speed and does not take into account the large amount of water inflow caused by the temperature difference between the temperature of the test sample and the temperature of the rainwater.
Technical specifications
#Model
#Working room size: (D)
#Test bench area
#Sample rack speed~r/adjustable
# Sample holder load-bearing
#Water for rainwater: Local clean tap water
#Main technical parameters of swing tube rain test:
. Water spray hole diameter:
. Spray hole spacing
. Radius of water spray ring
. Sprinkler pipe diameter
. The swing angle range of the swing tube is adjustable
. Swing speed adjustment stepless adjustment
. Average water velocity per hole./
. Total water flow:/
Structural design and configuration
The rain test equipment consists of a box/swing tube and a transmission/working rotary table/electrical control part.
.This set of rain test equipment is made of high-quality stainless steel materials. The equipment consists of a box body, a swing tube, a swing tube transmission mechanism, a working rotating table, and an electrical control part. The swing tube brackets, boxes, etc. are all made of stainless steel hairline plates. The swing tube does not shake when swinging. The equipment's rotating table sample holder, flange, connector and other accessories are all made of stainless steel, and the rotating table surface is made of hard plate or aluminum plate.
.This equipment is designed to install a set of swing tubes with a radius of mm. The nozzle is a detachable special nozzle. The nozzle hole is replaceable and the direction of the water spray can be adjusted. The water droplets ejected are even and the flow rate is sufficient. The transmission device of the swing tube is reasonably designed and made with precision. It is driven by an advanced stepper motor accelerator and reducer. The swing angle and frequency can be directly displayed on the instrument. The setting is controlled by the controller and the operation is simple to avoid the inaccuracy and cumbersome manual adjustment by feeling of similar equipment in the past.
.The swing tube and bracket are connected by flange, which is very convenient to install and disassemble. The swing tube is made of an industrial stainless steel pipe with an inner diameter and can swing back and forth. At the same time, water controlled at a certain flow rate and pressure is sprayed through the nozzle on the swing tube to conduct water tests on the test samples.
. The swing of the swing tube is completed by an advanced stepper motor. The rotation frequency and angle and the rotation speed of the turntable are automatically controlled by a programmable liquid crystal controller. After setting the swing speed and angle of the swing tube, press the set value to turn it on. Operation is simple. The sample rack turntable rotates horizontally. The entire equipment is reasonably designed and durable. On the premise that the equipment meets national standards and has stable performance in all aspects, it is more practical and easy to control, avoiding the inaccuracy and cumbersome manual adjustment of similar equipment in the past.
.The equipment is equipped with a set of water storage tanks of considerable capacity to supply the swing pipe water spray required for the test, which is resistant to pressure and corrosion. The water tank is covered to prevent dust and debris from entering. Equipped with water quality filter, water inlet float valve and drain valve.
.Rotary workbench: The top of the rotary workbench is made of hard plate to facilitate the installation of test specimens. The turntable is equipped with test specimen fixing bolts. The reducer is used to drive and adjust the speed to the rated speed.
.Electric control cabinet: Above it is the control panel control screen, and the button switches are placed here for easy operation and the working status is clear at a glance. Below is the high-power distribution cabinet where various executive components are installed. Reasonable arrangement, clear direction and easy maintenance. AC contactors and relays are all French Schneider brand products. Other components such as push button switches are from well-known brands.
.Observation window: In order to facilitate the observation of test conditions, the chamber door adopts a tempered glass door to observe the test status at any time.
.Waterway filter: All sprayed water must be filtered before returning to the water storage tank to prevent impurities from entering the water storage tank. All test water uses local clean tap water sources. Before the water in the water storage tank enters the drip tray, a filtering device is added to ensure that the drip holes are not easily blocked.
.Water pump: A stainless steel multi-stage centrifugal pump is used to meet the test water needs and pressure requirements.
.Flowmeter: The glass rotor flowmeter can be used to control the flow of water in real time.
.Pressure gauge: The current water source pressure is displayed by a pressure gauge that displays the actual pressure.
Circuit control and protection system
# The control liquid crystal display can be used to control the swing tube, turntable, water pump and test time respectively
● The maximum preset test time is hours and minutes
● Power-on function: On-off and on-off (with conductive slip rings to meet customer live tests)
● Imported executive components
#Equipped with water filter
#No fuse protection switch
/> #Overload, leakage, fully sheathed terminal block
#With automatic shutdown and other protections
Random information
#Instructions, circuit diagrams, certificates, warranty cards
#Operation methods , precautions, basic shipping accessories, maintenance matters
Equipment usage conditions
)Ambient temperature: ℃~+℃
)Ambient humidity: %
)Power supply requirements: ( % )/Three-phase five-wire system
d) Pre-installed capacity:
Delivery instructions
#The supplier is responsible for the freight and door-to-door delivery. The goods will be shipped within one working day after the prepayment is received
#When the contract comes into force, prepay % and the balance will be paid after passing the acceptance inspection
#The supplier is responsible for the installation and debugging operation introduction until the demander’s employees operate independently
#The warranty period is one year from the date of installation and acceptance count. The supplier promises to provide lifelong after-sales service of spare parts and must go to the site to solve the problem. The supplier will arrive at the user's site within hours.
Request for quotation
A total of0articles  Related Comments: